You’re invited to the opening of the Webster Library Transformation (Phase 1)

Join us on Monday, September 28 at 1:00 p.m. for the reopening of LB3 East.   See you there!

Furniture for the Reading Rooms

And finally, for the Reading Rooms, we are happy to share with you photos of the table (one of several variations) and chair selected following the tender process. The table is by Steelcase and the “Sayl Chair” is designed by Herman… Continue Reading →

Furniture coming to the Zero Noise / Friends of the Library room

  Great care went into choosing furniture for the Webster Transformation, but special attention was paid to the furniture for the Friends of the Library Room (outlined in green above) because of its very nature. The Friends of the Library Room… Continue Reading →

A glimpse at the furniture coming to the Collaboration Space

The Collaboration Space is located around the main Atrium on LB3 East. Only the Collaboration Space on the East side is currently being renovated as indicated by the orange rectangle below. It will include 3 fully-equipped Group Study Rooms and… Continue Reading →

Moving our collections

Prisma was awarded the contract to install the new black frames for the shelving on LB3 East. Most of the installation was done during the Construction Holiday to facilitate their work. Should everything go according to plan, books in the… Continue Reading →

Art in the Atrium

To be ready in time for Phase 2 (the renovation of the entire 5th floor) of the Webster Transformation which started right after the Construction Holiday, on August 2nd, the Library had to make plans to protect the art in… Continue Reading →